Tender | Trading VSH RoSY 2025/2026

In this tender procedure, we are providing storage capacities for the period from 3 July 2025 to 1 April 2026.  We are offering 1,550 GWh as the "Trading VSH" product in the THE market area.

You place your bid on our standard configuration with a increased injection rate and a turnover period of 144 days. We offer various additional products, such as day-ahead capacities, to optimise storage management during the period.

The bidding phase for this storage capacity will take place on 1 July 2025 at the latest from 01:00 pm to 01:30 pm CET. Allocation will take place by 02:00 pm CET. 

Bids will be based on a fixed price in €/MWh for the entire service period with a maximum of 4 decimal places. 


NOTE: The following conditions of participation apply to this tender procedure and all future procedures:

  • Bidding is only possible in the logged-in area
  • The bidder requires authorisation for online booking
  • VGS carries out a credit check; if the necessary documents are not yet available, we will ask you for them
  • If the credit check is negative or if a credit check is not possible due to missing documents, a security deposit must be provided in the event of a capacity surcharge.

Further information on this can also be found in the procedure description and in the registration and booking conditions.

Capacities

WGV in GWh |  1,550.00
IR in MWh/h | 1,240.00
WR in MWh/h | 1,271.00

Markt area

THE

Storage

VGS Storage Hub

Service Period

03/07/2025, 6 am - 01/04/2026, 6 am

Transport

Booking and nomination by storage customer

Lead time for renomination

2.0 h

Transfer point

VGS Storage Hub

Variable fee

0.700 €/MWh in SY25/26

Interruptibility

firm

Physical storage

yes

easystore configuration per GWh 

Minimum

Standard

Maximum

Working Gas VolumeGWh

-

1.00

-

Injection rateMWh/h

-

0.80

-

Withdrawal rateMWh/h

-

0.82

-

Injection durationDays

-

71

-

Withdrawal durationDays

-

73

-

Turnover durationDays

-

144

-

Sample contract  

Link

Procedure description

Link

GT&C

Link

Operating Manual

Link