Skip to main content

Tender | Trading VSH SY 2025 - 2027

In this tender procedure, we are providing storage capacities for the period from 1 April 2025 to 1 April 2027.  We are offering 1,000 GWh as the "Trading VSH" product in the THE market area.

Configure this high-performance storage product to suit your needs or bid on our standard configuration with a turnover period of 175 days. We offer various additional products, such as day-ahead capacities, to optimise storage management during the period.

The bidding phase for this storage capacity will take place on 25 April 2024 from 01:00 pm to 01:30 pm CET. Allocation will take place by 02:00 pm CET. 

Bids will be based on a fixed price in €/MWh/a with a maximum of 4 decimal places. 


NOTE: The following conditions of participation apply to this tender procedure and all future procedures:

  • Bidding is only possible in the logged-in area
  • The bidder requires authorisation for online booking
  • VGS carries out a credit check; if the necessary documents are not yet available, we will ask you for them
  • If the credit check is negative or if a credit check is not possible due to missing documents, a security deposit must be provided in the event of a capacity surcharge.

Further information on this can also be found in the procedure description and in the registration and booking conditions.

Capacities

WGV in GWh |  1,000.00
IR in MWh/h | 600.00
WR in MWh/h | 820.00

Markt area

THE

Storage

VGS Storage Hub

Service Period

01/04/2025, 6 am - 01/04/2027, 6 am

Transport

Booking and nomination by storage customer

Lead time for renomination

2.0 h

Transfer point

VGS Storage Hub

Variable fee

1.051 €/MWh in SY25/26

0.900 €/MWh in SY26/27

Interruptibility

firm

Physical storage

yes

easystore configuration per GWh MinimumStandardMaximum
Working Gas VolumeGWh1.001.001.00
Injection rateMWh/h0.350.601.20
Withdrawal rateMWh/h0.300.821.50
Injection durationDays17410251
Withdrawal durationDays1787345
Turnover durationDays35217596
Sample contract  

Link

Procedure discription

Link

GT&C

Link

Operating Manual

Link

Do you have questions or
need help deciding?