Hub Season is the key to balancing fluctuations in demand – for a good season: Your natural gas is stored physically and remains your property at all times. This allows you to optimally ensure supply to your customers. The quickest configuration offers a 1.4-fold turnover of your stored natural gas volumes. Use the practical standard configuration or customize your own individualized product easily using easystore.

Market area Gaspool
Turnover duration 258 - 444 Days
Characteristic curve restriction yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) no
Minimum booking amount 2.5 GWh
Transport Booking and nomination by VGS
Nomination Until 05:00 pm for the following day
Lead time for renomination 2.8 h
Implementation period Non binding booking request: Ten (10) woring days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes (BDL, BBG, ESE, KIH)
Transfer point VTP Gaspool
   
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.46 0.51
  Withdrawal rate MWh/h   0.25 0.38 0.41
  Injection duration Days   242 132 120
  Withdrawal duration Days   202 145 138
  Transfer duration Days   444 277 258
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
  Gas transfer   A Hub Season can be transferred between the contracts of Hub Season with an available contractual working gas volume in the corresponding amount.
  Capacity overrun     no
  (Partial) capacity transfer     yes
         

Fees

   
    2018/2019
Capacity fee
(refers to standard configuration)
  17.13 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
Usage-related fees   Injection fee
  Withdrawal fee
     

 

Documents

 
Sample contract Hub Season Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Hub) Icon - View and download the document
Fee schedule (Hub) Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.46
IRred MWh/h 0.22
WGABI GWh 0.57
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.46
WRred MWh/h 0.18
WGABW GWh 0.75
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.

Market area Gaspool
Turnover duration 258 - 444 Days
Characteristic curve restriction yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) no
Minimum booking amount 2.5 GWh
Transport Booking and nomination by VGS
Nomination Until 05:00 pm for the following day
Lead time for renomination 2.8 h
Implementation period Non binding booking request: Ten (10) woring days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes (BDL, BBG, ESE, KIH)
Transfer point VTP Gaspool
   
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.46 0.51
  Withdrawal rate MWh/h   0.25 0.38 0.41
  Injection duration Days   242 132 120
  Withdrawal duration Days   202 145 138
  Transfer duration Days   444 277 258
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
  Gas transfer   A Hub Season can be transferred between the contracts of Hub Season with an available contractual working gas volume in the corresponding amount.
  Capacity overrun     no
  (Partial) capacity transfer     yes
         

Fees

   
    2018/2019
Capacity fee
(refers to standard configuration)
  17.13 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
Usage-related fees   Injection fee
  Withdrawal fee
     

 

Documents

 
Sample contract Hub Season Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Hub) Icon - View and download the document
Fee schedule (Hub) Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.46
IRred MWh/h 0.22
WGABI GWh 0.57
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.46
WRred MWh/h 0.18
WGABW GWh 0.75
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.