Season VSH

Ensuring that you can supply your customers: Season VSH offers you the confidence of knowing that you have a real solution for balancing fluctuations in summer and winter demand. Use the practical standard configuration or customize your own individualized product easily using easystore.

Market area Gaspool
Storage VGS Storage Hub
Turnover duration 258 - 437 Days
Characteristic curve restrictions yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) 15% of firm bundled IR
Minimum booking amount 2.5 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) working days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Downtime period yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
       
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.45 0.50
  Withdrawal rate MWh/h   0.25 0.37 0.40
  Injection duration Days   238 132 120
  Withdrawal duration Days   199 146 138
  Transfer duration Days   437 278 258
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
    interruptible   Add on WR|IR
  Gas transfer   A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts).
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
    2017/2018
Service fee
(refers to standard configuration)
  16.99 €/GWh/d
Factor "Variable fee"   0.486 €/MWh
    2018/2019
Service fee
(refers to standard configuration)
  17.09 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual Icon - View and download the document
Fee Schedule Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.45
IRred MWh/h 0.23
WGABI GWh 0.57
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.37
WRred MWh/h 0.19
WGABW GWh 0.76
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.

Market area Gaspool
Storage VGS Storage Hub
Turnover duration 258 - 437 Days
Characteristic curve restrictions yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) 15% of firm bundled IR
Minimum booking amount 2.5 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) working days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Downtime period yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
       
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.45 0.50
  Withdrawal rate MWh/h   0.25 0.37 0.40
  Injection duration Days   238 132 120
  Withdrawal duration Days   199 146 138
  Transfer duration Days   437 278 258
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
    interruptible   Add on WR|IR
  Gas transfer   A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts).
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
    2017/2018
Service fee
(refers to standard configuration)
  16.99 €/GWh/d
Factor "Variable fee"   0.486 €/MWh
    2018/2019
Service fee
(refers to standard configuration)
  17.09 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual Icon - View and download the document
Fee Schedule Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.45
IRred MWh/h 0.23
WGABI GWh 0.57
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.37
WRred MWh/h 0.19
WGABW GWh 0.76
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.

Do you have questions or
need help deciding?

In line with Demand: Season KIH

Ensuring that you can supply your customers: Season KIH offers you the confidence of knowing that you have a real solution for balancing summer and winter demand fluctuations in Kirchheiligen. Use the practical standard configuration or customize your own individualized product easily using easystore.

Market area Gaspool
Storage Kirchheilingen
Turnover duration 183 - 463 Days
Characteristic curve restrictions yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) 15% of firm bundled IR
Minimum booking amount 2.5 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) working days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Downtime period yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
Kirchheilingen Gaspool ONTRAS Gastransport GmbH UGS Kirchheilingen
       
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.51 0.70
  Withdrawal rate MWh/h   0.25 0.51 1.00
  Injection duration Days   244 120 88
  Withdrawal duration Days   219 134 95
  Transfer duration Days   463 254 183
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
    interruptible   Add on WR|IR
  Gas transfer   A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts).
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
    2017/2018
Service fee
(refers to standard configuration)
  17.78 €/GWh/d
Factor "Variable fee"   0.486 €/MWh
    2018/2019
Service fee
(refers to standard configuration)
  17.88 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual Icon - View and download the document
Fee Schedule Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.51
IRred MWh/h 0.16
WGABI GWh 0.78
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.51
WRred MWh/h 0.04
WGABW GWh 0.39
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.

Market area Gaspool
Storage Kirchheilingen
Turnover duration 183 - 463 Days
Characteristic curve restrictions yes
Minimum level no
Interruptibility firm
IR+ (additional interruptible IR) 15% of firm bundled IR
Minimum booking amount 2.5 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) working days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Downtime period yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
Kirchheilingen Gaspool ONTRAS Gastransport GmbH UGS Kirchheilingen
       
easystore configuration boundaries per 1 GWh   Minimum Standard Maximum
  Injection rate MWh/h   0.25 0.51 0.70
  Withdrawal rate MWh/h   0.25 0.51 1.00
  Injection duration Days   244 120 88
  Withdrawal duration Days   219 134 95
  Transfer duration Days   463 254 183
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Combination with other products firm   Add on WGV|WR|IR
    interruptible   Add on WR|IR
  Gas transfer   A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts).
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
    2017/2018
Service fee
(refers to standard configuration)
  17.78 €/GWh/d
Factor "Variable fee"   0.486 €/MWh
    2018/2019
Service fee
(refers to standard configuration)
  17.88 €/GWh/d
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual Icon - View and download the document
Fee Schedule Icon - View and download the document
   
Injection characteristic curve
IR100% MWh/h 0.51
IRred MWh/h 0.16
WGABI GWh 0.78
WGAB100% GWh 1.00
     
Withdrawal characteristic curve
WR100% MWh/h 0.51
WRred MWh/h 0.04
WGABW GWh 0.39
WGAB100% GWh 1.00

* These are the characteristics of the default configuration example of 1 GWh.