Season VSH
Ensuring that you can supply your customers: Season VSH offers you the confidence of knowing that you have a real solution for balancing fluctuations in summer and winter demand. Use the practical standard configuration or customize your own individualized product easily using easystore.
Market area | Gaspool | ||
Storage | VGS Storage Hub | ||
Turnover duration | 258 - 437 Days | ||
Characteristic curve restrictions | yes | ||
Minimum level | no | ||
Interruptibility | firm | ||
IR+ (additional interruptible IR) | 15% of firm bundled IR | ||
Minimum booking amount | 2.5 GWh | ||
Transport | Booking and nomination by storage customer | ||
Lead time for renomination | 2.0 h | ||
Implementation period | Non binding booking request: | Ten (10) working days | |
Online booking: | Two (2) working days | ||
Transfer of ownership | no | ||
Physical storage | yes | ||
Downtime period | yes | ||
Transfer point | |||
---|---|---|---|
Storage | Market area | Adjacent network operator | Gas transfer point |
VGS Storage Hub | Gaspool | ONTRAS Gastransport GmbH | VGS Storage Hub |
easystore configuration boundaries per 1 GWh | Minimum | Standard | Maximum | |||
Injection rate | MWh/h | 0.25 | 0.45 | 0.50 | ||
Withdrawal rate | MWh/h | 0.25 | 0.37 | 0.40 | ||
Injection duration | Days | 238 | 132 | 120 | ||
Withdrawal duration | Days | 199 | 146 | 138 | ||
Transfer duration | Days | 437 | 278 | 258 | ||
Contract term | ||||||
Start | Possible for each gas day | |||||
Duration | At least 1 gas day, maximum of 20 years | |||||
Additional services | ||||||
Combination with other products | firm | Add on WGV|WR|IR | ||||
interruptible | Add on WR|IR | |||||
Gas transfer | A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). | |||||
Capacity overrun | yes | |||||
(Partial) capacity transfer | yes | |||||
![]() | Injection characteristic curve | ![]() | ||
IR100% | MWh/h | 0.45 | ||
IRred | MWh/h | 0.23 | ||
WGABI | GWh | 0.57 | ||
WGAB100% | GWh | 1.00 | ||
Withdrawal characteristic curve | ||||
WR100% | MWh/h | 0.37 | ||
WRred | MWh/h | 0.19 | ||
WGABW | GWh | 0.76 | ||
WGAB100% | GWh | 1.00 |
* These are the characteristics of the default configuration example of 1 GWh.
Market area | Gaspool | ||
Storage | VGS Storage Hub | ||
Turnover duration | 258 - 437 Days | ||
Characteristic curve restrictions | yes | ||
Minimum level | no | ||
Interruptibility | firm | ||
IR+ (additional interruptible IR) | 15% of firm bundled IR | ||
Minimum booking amount | 2.5 GWh | ||
Transport | Booking and nomination by storage customer | ||
Lead time for renomination | 2.0 h | ||
Implementation period | Non binding booking request: | Ten (10) working days | |
Online booking: | Two (2) working days | ||
Transfer of ownership | no | ||
Physical storage | yes | ||
Downtime period | yes | ||
Transfer point | |||
---|---|---|---|
Storage | Market area | Adjacent network operator | Gas transfer point |
VGS Storage Hub | Gaspool | ONTRAS Gastransport GmbH | VGS Storage Hub |
easystore configuration boundaries per 1 GWh | Minimum | Standard | Maximum | |||
Injection rate | MWh/h | 0.25 | 0.45 | 0.50 | ||
Withdrawal rate | MWh/h | 0.25 | 0.37 | 0.40 | ||
Injection duration | Days | 238 | 132 | 120 | ||
Withdrawal duration | Days | 199 | 146 | 138 | ||
Transfer duration | Days | 437 | 278 | 258 | ||
Contract term | ||||||
Start | Possible for each gas day | |||||
Duration | At least 1 gas day, maximum of 20 years | |||||
Additional services | ||||||
Combination with other products | firm | Add on WGV|WR|IR | ||||
interruptible | Add on WR|IR | |||||
Gas transfer | A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). | |||||
Capacity overrun | yes | |||||
(Partial) capacity transfer | yes | |||||
![]() | Injection characteristic curve | ![]() | ||
IR100% | MWh/h | 0.45 | ||
IRred | MWh/h | 0.23 | ||
WGABI | GWh | 0.57 | ||
WGAB100% | GWh | 1.00 | ||
Withdrawal characteristic curve | ||||
WR100% | MWh/h | 0.37 | ||
WRred | MWh/h | 0.19 | ||
WGABW | GWh | 0.76 | ||
WGAB100% | GWh | 1.00 |
* These are the characteristics of the default configuration example of 1 GWh.
Do you have questions or
need help deciding?
In line with Demand: Season KIH
Ensuring that you can supply your customers: Season KIH offers you the confidence of knowing that you have a real solution for balancing summer and winter demand fluctuations in Kirchheiligen. Use the practical standard configuration or customize your own individualized product easily using easystore.
Market area | Gaspool | ||
Storage | Kirchheilingen | ||
Turnover duration | 183 - 463 Days | ||
Characteristic curve restrictions | yes | ||
Minimum level | no | ||
Interruptibility | firm | ||
IR+ (additional interruptible IR) | 15% of firm bundled IR | ||
Minimum booking amount | 2.5 GWh | ||
Transport | Booking and nomination by storage customer | ||
Lead time for renomination | 2.0 h | ||
Implementation period | Non binding booking request: | Ten (10) working days | |
Online booking: | Two (2) working days | ||
Transfer of ownership | no | ||
Physical storage | yes | ||
Downtime period | yes | ||
Transfer point | |||
---|---|---|---|
Storage | Market area | Adjacent network operator | Gas transfer point |
Kirchheilingen | Gaspool | ONTRAS Gastransport GmbH | UGS Kirchheilingen |
easystore configuration boundaries per 1 GWh | Minimum | Standard | Maximum | |||
Injection rate | MWh/h | 0.25 | 0.51 | 0.70 | ||
Withdrawal rate | MWh/h | 0.25 | 0.51 | 1.00 | ||
Injection duration | Days | 244 | 120 | 88 | ||
Withdrawal duration | Days | 219 | 134 | 95 | ||
Transfer duration | Days | 463 | 254 | 183 | ||
Contract term | ||||||
Start | Possible for each gas day | |||||
Duration | At least 1 gas day, maximum of 20 years | |||||
Additional services | ||||||
Combination with other products | firm | Add on WGV|WR|IR | ||||
interruptible | Add on WR|IR | |||||
Gas transfer | A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). | |||||
Capacity overrun | yes | |||||
(Partial) capacity transfer | yes | |||||
![]() | Injection characteristic curve | ![]() | ||
IR100% | MWh/h | 0.51 | ||
IRred | MWh/h | 0.16 | ||
WGABI | GWh | 0.78 | ||
WGAB100% | GWh | 1.00 | ||
Withdrawal characteristic curve | ||||
WR100% | MWh/h | 0.51 | ||
WRred | MWh/h | 0.04 | ||
WGABW | GWh | 0.39 | ||
WGAB100% | GWh | 1.00 |
* These are the characteristics of the default configuration example of 1 GWh.
Market area | Gaspool | ||
Storage | Kirchheilingen | ||
Turnover duration | 183 - 463 Days | ||
Characteristic curve restrictions | yes | ||
Minimum level | no | ||
Interruptibility | firm | ||
IR+ (additional interruptible IR) | 15% of firm bundled IR | ||
Minimum booking amount | 2.5 GWh | ||
Transport | Booking and nomination by storage customer | ||
Lead time for renomination | 2.0 h | ||
Implementation period | Non binding booking request: | Ten (10) working days | |
Online booking: | Two (2) working days | ||
Transfer of ownership | no | ||
Physical storage | yes | ||
Downtime period | yes | ||
Transfer point | |||
---|---|---|---|
Storage | Market area | Adjacent network operator | Gas transfer point |
Kirchheilingen | Gaspool | ONTRAS Gastransport GmbH | UGS Kirchheilingen |
easystore configuration boundaries per 1 GWh | Minimum | Standard | Maximum | |||
Injection rate | MWh/h | 0.25 | 0.51 | 0.70 | ||
Withdrawal rate | MWh/h | 0.25 | 0.51 | 1.00 | ||
Injection duration | Days | 244 | 120 | 88 | ||
Withdrawal duration | Days | 219 | 134 | 95 | ||
Transfer duration | Days | 463 | 254 | 183 | ||
Contract term | ||||||
Start | Possible for each gas day | |||||
Duration | At least 1 gas day, maximum of 20 years | |||||
Additional services | ||||||
Combination with other products | firm | Add on WGV|WR|IR | ||||
interruptible | Add on WR|IR | |||||
Gas transfer | A Season product can be transferred between the contracts of the same product. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). | |||||
Capacity overrun | yes | |||||
(Partial) capacity transfer | yes | |||||
![]() | Injection characteristic curve | ![]() | ||
IR100% | MWh/h | 0.51 | ||
IRred | MWh/h | 0.16 | ||
WGABI | GWh | 0.78 | ||
WGAB100% | GWh | 1.00 | ||
Withdrawal characteristic curve | ||||
WR100% | MWh/h | 0.51 | ||
WRred | MWh/h | 0.04 | ||
WGABW | GWh | 0.39 | ||
WGAB100% | GWh | 1.00 |
* These are the characteristics of the default configuration example of 1 GWh.