In this tender procedure we offer you a total capacity of 600 GWh for our Etzel ESE storage facility. This capacity will be available to you for two storage years from 01.04.2021 and is available as "Trading" product. Take advantage of the full flexibility in two market areas - GASPOOL and NCG.

You have already insight into all relevant contract documents. The bidding phase will take place on 28 October 2020 in the time from 01:00 - 01:30 pm. Allocation will take place 30 minutes after the end of the bidding phase. You bid on a fixed price in €/MWh/a with a maximum of four decimal places and several bids can be submitted.

Don't you receive our newsletter yet? Simply subscribe to our newsletter and you will never miss any news again. 

 

Capacities
WGV in GWh 600.00
IR in MWh/h 522.00
WR in MWh/h 660.00
Market area GASPOOL
Net Connect Germany
Storage location Etzel ESE
Service period 01/04/2021, 6 am - 01/04/2023, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point Etzel ESE GASPOOL (GASPOOL / OGE)
UGS Etzel-ESE (GASPOOL / Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (NCG / OGE) 
Variable fee

2021/22: 0.485€/MWh
2022/23: acc. adjustment formula

easystore configuration per bundle Min Standard Max
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.60 0.87 1.10
  Withdrawal rate MWh/h 0.80 1.10 1.40
  Injection duration Days 81 60 50
  Withdrawal duration Days 54 40 33
  Turnover duration Days 135 100 83
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Capacities
WGV in GWh 600.00
IR in MWh/h 522.00
WR in MWh/h 660.00
Market area GASPOOL
Net Connect Germany
Storage location Etzel ESE
Service period 01/04/2021, 6 am - 01/04/2023, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point Etzel ESE GASPOOL (GASPOOL / OGE)
UGS Etzel-ESE (GASPOOL / Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (NCG / OGE) 
Variable fee

2021/22: 0.485€/MWh
2022/23: acc. adjustment formula

easystore configuration per bundle Min Standard Max
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.60 0.87 1.10
  Withdrawal rate MWh/h 0.80 1.10 1.40
  Injection duration Days 81 60 50
  Withdrawal duration Days 54 40 33
  Turnover duration Days 135 100 83
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Tender Trading VSH 2022/23

In a tender procedure, we offer a total capacity of 1.0 TWh. This capacity is available for use from 01/04/2022 for one storage year and is available as product "Trading VSH". The gas delivery takes place at the VGS Storage Hub.

You have already insight into all relevant contract documents. The bidding phase will take place on 31 August 2020 at the earliest and on 30 October 2020 at the latest between 01:00 - 01:30 pm. Allocation will take place 30 minutes after the end of the bidding phase. You bid on a fixed price in €/MWh with a maximum of four decimal places and several bids can be submitted.

 

 

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area GASPOOL
Service period 01/04/2022, 6 am - 01/04/2023, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
 
easystore configuration per bundle Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area GASPOOL
Service period 01/04/2022, 6 am - 01/04/2023, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
 
easystore configuration per bundle Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Tender Trading VSH 5Y

Are you looking for long-term storage capacities? 

In a further tender procedure we offer a capacity of 1.0 TWh as "Trading" product. You use the storage for 5 storage years, starting from 01 April 2022 in the future market area "Trading Hub Europe":

You already have access to all relevant contract documents. The bidding phase will take place on 07 October from 01:00 pm - 01:30 pm. Allocation will take place 30 minutes after the end of the bidding phase. You bid on a premium in €/MWh with a maximum of four decimal places. The product cannot be configured.

Don't you receive our newsletter yet? Simply subscribe to our newsletter and you will never miss any news again. 

 

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area THE (Trading Hub Europe)
Service period 01/04/2022, 6 am - 01/04/2027, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
easystore configuration per bundle Standard
  Working Gas Volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.82
  Injection duration Days 102
  Withdrawal duration Days 73
  Turnover duration Days 175
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area THE (Trading Hub Europe)
Service period 01/04/2022, 6 am - 01/04/2027, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
easystore configuration per bundle Standard
  Working Gas Volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.82
  Injection duration Days 102
  Withdrawal duration Days 73
  Turnover duration Days 175
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Tender Trading VSH 5Y

Are you looking for long-term storage capacities? 

In a further tender procedure we offer a capacity of 1.0 TWh as "Trading" product. You use the storage for 5 storage years, starting from 01 April 2022 in the future market area "Trading Hub Europe":

You already have access to all relevant contract documents. The bidding phase will take place on 07 October from 01:00 pm - 01:30 pm. Allocation will take place 30 minutes after the end of the bidding phase. You bid on a premium in €/MWh with a maximum of four decimal places. The product cannot be configured.

Don't you receive our newsletter yet? Simply subscribe to our newsletter and you will never miss any news again. 

 

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area THE (Trading Hub Europe)
Service period 01/04/2022, 6 am - 01/04/2027, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
easystore configuration per bundle Standard
  Working Gas Volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.82
  Injection duration Days 102
  Withdrawal duration Days 73
  Turnover duration Days 175
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Capacities
WGV in GWh 1,000.00
IR in MWh/h 600.00
WR in MWh/h 820.00
Market area THE (Trading Hub Europe)
Service period 01/04/2022, 6 am - 01/04/2027, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point ONTRAS VGS Storage Hub
Variable fee acc. adjustment formula
easystore configuration per bundle Standard
  Working Gas Volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.82
  Injection duration Days 102
  Withdrawal duration Days 73
  Turnover duration Days 175
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 2404.

Benefit from our storage zone by an even higher probability of use of your booked capacities. We optimize our storage facilities and the associated maintenance measures.

You can find our current and planned maintenance measures here.

Tender | Trading ESE - RoSY

We are pleased to be able to offer you again at short notice capacities for our product "Trading ESE" for the current storage year. 

Use the storage product "Trading ESE" already from Friday, 18 September 2020, 6:00 am and secure flexibility for the current Storage Year 2020/2021. Please note the published maintenance procedures at Etzel ESE. 

You already have access to all relevant contract documents. The bidding phase will take place on Wednesday, 16 September 2020 from 1:00 - 1:30 pm and the allocation will take place until 2:00 pm. You bid at a fixed price in €/MWh. 

Don't you receive our newsletter yet? Simply subscribe to our newsletter and you will never miss any news again. 

 

 

Capacities
WGV in GWh 40.00
IR in MWh/h 55.00
WR in MWh/h 45.00
Market area GASPOOL
Net Connect Germany
Storage location Etzel ESE
Service period 18/09/2020, 6 am - 01/04/2021, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point Etzel ESE GASPOOL (GASPOOL / OGE)
UGS Etzel-ESE (GASPOOL / Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (NCG / OGE) 
Variable fee

0.495€/MWh

easystore configuration per bundle Standard
  Working Gas Volume GWh 40.00
  Injection rate MWh/h 55.00
  Withdrawal rate MWh/h 45.00
  Injection duration Days 42
  Withdrawal duration Days 39
  Turnover duration Days 81
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Capacities
WGV in GWh 40.00
IR in MWh/h 55.00
WR in MWh/h 45.00
Market area GASPOOL
Net Connect Germany
Storage location Etzel ESE
Service period 18/09/2020, 6 am - 01/04/2021, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.00 h
Transfer point Etzel ESE GASPOOL (GASPOOL / OGE)
UGS Etzel-ESE (GASPOOL / Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (NCG / OGE) 
Variable fee

0.495€/MWh

easystore configuration per bundle Standard
  Working Gas Volume GWh 40.00
  Injection rate MWh/h 55.00
  Withdrawal rate MWh/h 45.00
  Injection duration Days 42
  Withdrawal duration Days 39
  Turnover duration Days 81
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments