Trading+Gas 

In this tender procedure, we offer you a total capacity of 200 GWh for the "Trading+Gas" product in the THE market area. You can start withdrawing gas as early as 27 January 2022 and act on the market immediately. Store the gas again at a later date and hand the filled storage back over to us at the end of the contract on 1 October 2022.

Bidding for the gas-filled storage will take place on 21 January 2022 between the hours of 1:00 pm - 1:30 pm. Allocation will take place 30 minutes after the end of the bidding period. You bid on a fixed price in €/MWh with a maximum of four decimal places. The product cannot be configured.

Capacities WGV  200.00 GWh
IR       120.00 MWh/h
  WR    300.00 MWh/h
Market area THE
Storage VGS Storage Hub
Service Period 27/01/2022, 6a.m. - 01/10/2022, 6 a.m.
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Filling level begin | end of contract period 100 % | 100 %
Variable fee 2021/2022: 0.485 €/MWh
2022/2023: 0.446 €/MWh
Interruptibility firm
 
easystore configuration per bundel Minimum Standard Maximum
  Working Gas Volume GWh - 200.00 -
  Injection rate MWh/h - 120.00 -
  Withdrawal rate MWh/h - 300.00 -
  Injection duration Days - 102 -
  Withdrawal duration Days - 35 -
  Turnover duration Days - 137 -
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
Sample document for security  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 5744.

A guarantee must be made within 5 working days. The amount of the guarantee is 13,000,000 Euro. The guarantee must be valid for 9 months after the end of the performance period.

A sample form for the guarantee can be found here.

 

 

A gas transfer from another contract to this new contract is possible on request.
No gas can be transferred from this contract to another contract.

Capacities WGV  200.00 GWh
IR       120.00 MWh/h
  WR    300.00 MWh/h
Market area THE
Storage VGS Storage Hub
Service Period 27/01/2022, 6a.m. - 01/10/2022, 6 a.m.
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Filling level begin | end of contract period 100 % | 100 %
Variable fee 2021/2022: 0.485 €/MWh
2022/2023: 0.446 €/MWh
Interruptibility firm
 
easystore configuration per bundel Minimum Standard Maximum
  Working Gas Volume GWh - 200.00 -
  Injection rate MWh/h - 120.00 -
  Withdrawal rate MWh/h - 300.00 -
  Injection duration Days - 102 -
  Withdrawal duration Days - 35 -
  Turnover duration Days - 137 -
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
Sample document for security  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Here you will find answers to the most frequently asked questions. 

If you cannot find an answer to your question here, we will be happy to help you personally. 
Write to sales@vng-gasspeicher.de or call us on +49(0)341.443 5744.

A guarantee must be made within 5 working days. The amount of the guarantee is 13,000,000 Euro. The guarantee must be valid for 9 months after the end of the performance period.

A sample form for the guarantee can be found here.

 

 

A gas transfer from another contract to this new contract is possible on request.
No gas can be transferred from this contract to another contract.

Do you have other questions about VNG Gasspeicher GmbH's services?

Tender Trading VSH 5Y 

We market storage capacities for five storage years - from 1 April 2024 to 1 April 2029.

In a tender procedure, we offer a capacity of 1,000 GWh as a "Trading VSH" product. You benefit from a flexible storage product in the THE market area, which you can adapt to your needs at any time with our add-on products, e.g. Day-Ahead.

You already have an insight into all relevant contract documents. The bidding phase will take place on 1 December 2021 between 1:00 and 1:30 pm. The allocation will take place within 30 minutes after the end of the bidding. You bid for a premium in €/MWh/a with a maximum of four decimal places.

Don't you receive our newsletter yet? You can easily subscribe to our newsletter here and you will no longer miss any news.

Capacity
   
WGV in GWh 550.00
IR in MWh/h 478.50
WR in MWh/h 605.00
Storage location Etzel
Market area  THE (Trading Hub Europe)
Gas transfer point UGS Etzel-ESE (Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (OGE)
Service period 01/04/2022, 6 am - 01/04/2024, 6 am
Transport booking and nomination by storage customer
Variable fee

2022/2023: 0.446 €/MWh
2023/2024: according adjustment formular

Interruptibility firm
 
      Minimum Standard Maximum
  Working gas volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.60 0.87 1.10
  Withdrawal rate MWh/h 0.80 1.10 1.40
  Injection duration days 81 60 50
  Withdrawal duration days 54 40 33
  Turn over period days 135 100 83

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Will the account model still exist after the market area merger?

Yes, there will continue to be discount and non-discount accounts per gas transfer point.

The Etzel storage facility is basically a multi-market storage facility. VGS gives your customers at the Etzel storage facility access to the THE market area - with the adjacent network operators Open Grid Europe GmbH (OGE) and Gasunie Deutschland Transport (GUD).

The TSOs - such as OGE - also offer discounted and non-discounted transport capacities. Thus, we appropriately continue the account model and also enable gas transfers between SSOs.

Gas quantities can be transferred between different discount accounts or different non-discount accounts as desired, or this is done automatically as part of the withdrawal process.

Capacity
   
WGV in GWh 550.00
IR in MWh/h 478.50
WR in MWh/h 605.00
Storage location Etzel
Market area  THE (Trading Hub Europe)
Gas transfer point UGS Etzel-ESE (Gasunie)
Etzel (Speicher ESE), Bitzenlander Weg 3 (OGE)
Service period 01/04/2022, 6 am - 01/04/2024, 6 am
Transport booking and nomination by storage customer
Variable fee

2022/2023: 0.446 €/MWh
2023/2024: according adjustment formular

Interruptibility firm
 
      Minimum Standard Maximum
  Working gas volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.60 0.87 1.10
  Withdrawal rate MWh/h 0.80 1.10 1.40
  Injection duration days 81 60 50
  Withdrawal duration days 54 40 33
  Turn over period days 135 100 83

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Will the account model still exist after the market area merger?

Yes, there will continue to be discount and non-discount accounts per gas transfer point.

The Etzel storage facility is basically a multi-market storage facility. VGS gives your customers at the Etzel storage facility access to the THE market area - with the adjacent network operators Open Grid Europe GmbH (OGE) and Gasunie Deutschland Transport (GUD).

The TSOs - such as OGE - also offer discounted and non-discounted transport capacities. Thus, we appropriately continue the account model and also enable gas transfers between SSOs.

Gas quantities can be transferred between different discount accounts or different non-discount accounts as desired, or this is done automatically as part of the withdrawal process.