Scroll

Tender | 3-Phase Storage VSH

In this tender procedure, we offer storage capacities for the period 23 November 2022 to 01 September 2023. You have 170 GWh as a "3-Phase Storage" product in the THE market area. You store gas until 01 December 2022 (phase 1) and use it for your needs from 01 June 2023 (phase 3). In the interim period (phase 2) the storage must be completely full and no injection or withdrawal is possible. You will find the detailled information on this minimum fill level in the contract. 

The bidding phase for this storage capacity will take place on 21 November 2022 from 1:00 pm to 1:30 pm. Allocation will take place by 02:00 pm. You bid on a fixed price in €/MWh with max. 4 decimal places.

 

You do not receive our newsletter yet? You can easily subscribe to our newsletter here and you will no longer miss any news. 

 

Capacity
   
  WGV in GWh | 170.00 
   IR in MWh/h | 1.400.00 
  WR in MWh/h | 140.00 
Storage location VGS Storage Hub
Market area  THE (Trading Hub Europe)
Gas transfer point VGS Storage Hub
Service period 23/11/2022, 6 am - 01/09/2023, 6 am
Transport booking and nomination by storage customer
Variable fee 1.30 €/MWh
Interruptibility firm
 
      Standard
  Working gas volume GWh 1.00
  Injection rate MWh/h 8.23
  Withdrawal rate MWh/h 0.82
  Injection duration days 5
  Withdrawal duration days 73
  Turn over period days 78

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Capacity
   
  WGV in GWh | 170.00 
   IR in MWh/h | 1.400.00 
  WR in MWh/h | 140.00 
Storage location VGS Storage Hub
Market area  THE (Trading Hub Europe)
Gas transfer point VGS Storage Hub
Service period 23/11/2022, 6 am - 01/09/2023, 6 am
Transport booking and nomination by storage customer
Variable fee 1.30 €/MWh
Interruptibility firm
 
      Standard
  Working gas volume GWh 1.00
  Injection rate MWh/h 8.23
  Withdrawal rate MWh/h 0.82
  Injection duration days 5
  Withdrawal duration days 73
  Turn over period days 78

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Do you have other questions about VNG Gasspeicher GmbH's services?

Tender | Hub Trading

We publish another tender procedure with storage capacities for the coming year 2023/24. You use up to 540 GWh as product "Hub Trading" in the performance period 01 April 2023 to 01 April 2024 at the VTP Trading Hub Europe.

You conveniently deliver the gas to the VTP, we book the transport for you. In addition, benefit from the high product flexibility - conveniently adjust the storage to your needs with various add-on products, e.g. Day-Ahead.

The bidding phase for this storage capacity will take place no earlier than 14 November and no later than 16 December 2022, from 1:00 pm to 1:30 pm. Allocation will take place by 02:00 pm. You bid on a fixed price in €/MWh with max. 4 decimal places.
 

You do not receive our newsletter yet? You can easily subscribe to our newsletter here and you will no longer miss any news. 

 

Capacity
   
  WGV | 540.00 in GWh
   IR | 324.00 in MWh/h
  WR | 432.00 in MWh/h
Storage location VTP
Market area  THE (Trading Hub Europe)
Gas transfer point VTP THE
Service period 01/04/2023, 6 am - 01/04/2024, 6 am
Transport booking and nomination by VGS
Variable fee 1.163 €/MWh
Interruptibility firm
usage related fees yes
 
      Standard
  Working gas volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.80
  Injection duration days 95
  Withdrawal duration days 69
  Turn over period days 164

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Usage related costs: 

 

DI

DW

UW
 

ct/(kWh/h)/d

ct/(kWh/h)/d

€/MWh

Jan - Dec

0.3698

0.3698

0.38
Capacity
   
  WGV | 540.00 in GWh
   IR | 324.00 in MWh/h
  WR | 432.00 in MWh/h
Storage location VTP
Market area  THE (Trading Hub Europe)
Gas transfer point VTP THE
Service period 01/04/2023, 6 am - 01/04/2024, 6 am
Transport booking and nomination by VGS
Variable fee 1.163 €/MWh
Interruptibility firm
usage related fees yes
 
      Standard
  Working gas volume GWh 1.00
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.80
  Injection duration days 95
  Withdrawal duration days 69
  Turn over period days 164

 

 

 

 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual  Icon - Ansehen und Download des Dokuments

 

Usage related costs: 

 

DI

DW

UW
 

ct/(kWh/h)/d

ct/(kWh/h)/d

€/MWh

Jan - Dec

0.3698

0.3698

0.38

Do you have other questions about VNG Gasspeicher GmbH's services?

 Tender Trading VSH

In this tender procedure, we offer you a total capacity of 1.0 TWh for the "Trading VSH" product in the THE market area for the service period from 01 April 2024 to 01 April 2025. During the contract period, you can easily book Day-Ahead capacities online for this product and thus react directly to short-term price volatilities. 

The bidding phase will take place on 8 December 2022 between 01:00 - 01:30 pm. Allocation will take place 30 minutes after the end of the bidding phase. You bid on a fixed price in €/MWh with a maximum of four decimal places.

 

Capacities WGV in GWh |  1.000,00
IR in MWh/h | 600.00
  WR in MWh/h | 820.00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2024, 6 am - 01/04/2025, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

2024/25 | 1.163 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Capacities WGV in GWh |  1.000,00
IR in MWh/h | 600.00
  WR in MWh/h | 820.00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2024, 6 am - 01/04/2025, 6 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

2024/25 | 1.163 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments