Scroll

Tender | Trading VSH 24/25

In this tender procedure, we offer storage capacitiy for the period from 01 April 2024 to 01 April 2025500 GWh is available as a "Trading" product in the THE market area.

Configure this powerful storage product according to your needs or bid on our standard configuration with a turnaround time of 175 days. For optimal storage movement, we offer various add on products during the term, such as Day-Ahead capacity.

The bidding phase for this storage capacity will take place 21 November 2023 from 1:00 pm to 1:30 pm CET. The allocation will take place by 2:00 pm. You bid on a fixed price in €/MWh with max. 4 decimal places. 

As always, we will keep you informed of the exact day of the auction via our newsletter. You will receive this announcement from us at least 24 hours before the auction starts. You can sign up for our newsletter here.


NOTE: For this tender procedure as well as for upcoming procedures following conditions of participation apply:

  • bidding is only possible in the logged-in area
  • for bidding the bidder needs an authorization for online booking
  • VGS performs a credit check; if necessary documents are not yet available, we will ask you for them
  • If the credit check is negative or no credit check is possible due to missing documents, a security deposit must be made for capacity surcharge.

You will find further information on this in the procedure description and in the registration and booking conditions.

Capacities WGV in GWh |  500.00
IR in MWh/h | 300.00
  WR in MWh/h | 410,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2024, 6:00 am - 01/04/2025, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

1.248 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Capacities WGV in GWh |  500.00
IR in MWh/h | 300.00
  WR in MWh/h | 410,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2024, 6:00 am - 01/04/2025, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

1.248 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Do you have other questions about VNG Gasspeicher GmbH's services?

Tender | Trading VSH 25/26

In this tender procedure, we offer storage capacities for the period from 01 April 2025 to 01 April 20261.000 GWh is available as a "Trading" product in the THE market area.

Configure this powerful storage product according to your needs or bid on our standard configuration with a turnaround time of 175 days. For optimal storage movement, we offer various add on products during the term, such as Day-Ahead capacity.

The bidding phase for this storage capacity will take place on 6 December 2023 from 1:00 pm to 1:30 pm CEST. The allocation will take place by 2:00 pm. You bid on a fixed price in €/MWh with max. 4 decimal places. 

As always, we will keep you informed of the exact day of the auction via our newsletter. You will receive this announcement from us at least 24 hours before the auction starts. You can sign up for our newsletter here.


NOTE: For this tender procedure as well as for upcoming procedures following conditions of participation apply:

  • bidding is only possible in the logged-in area
  • for bidding the bidder needs an authorization for online booking
  • VGS performs a credit check; if necessary documents are not yet available, we will ask you for them
  • If the credit check is negative or no credit check is possible due to missing documents, a security deposit must be made for capacity surcharge.

You will find further information on this in the procedure description and in the registration and booking conditions.

Capacities WGV in GWh |  1,000.00
IR in MWh/h | 600.00
  WR in MWh/h | 820,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2025, 6:00 am - 01/04/2026, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

0.95 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Capacities WGV in GWh |  1,000.00
IR in MWh/h | 600.00
  WR in MWh/h | 820,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2025, 6:00 am - 01/04/2026, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

0.95 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Do you have questions or
need help deciding?

Tender | Hub Trading

For the coming storage year 2024/2025, we are offering 500 GWh for the "Hub Trading" product. The Hub product's distinct advantage lies in its convenient gas handover at the VHP Trading Hub Europe. We take care of the transport booking on your behalf.

The bidding phase for this storage capacity will take place on 9 November 2023 from 1:00 to 1:30 pm. The allocation will take place by 2:00 pm. You bid on a fixed price in €/MWh with max. 4 decimal places.


​NOTE: For this tender procedure as well as for upcoming procedures following conditions of participation apply:
  • Bidding is only possible in the logged-in area.
  • For bidding the bidder needs an authorization for online booking.
  • VGS performs a credit check; if necessary documents are not yet available, we will ask you for them.
  • If the credit check is negative or no credit check is possible due to missing documents, a security deposit must be made for capacity surcharge.

You will find further information on this in the procedure description and in the registration and booking conditions.

Capacity
WGV in GWh 500.00
IR in MWh/h 300.00
WR in MWh/h 400.00
Market area  Trading Hub Europe (THE)
Gas transfer point VHP THE
Service period 01/04/2024, 6 am - 01/04/2025, 6 am
Transport booking and nomination by VGS
Nomination until 04:30 pm for the following day
Lead time for renomination 2.25 h
Variable fee  1.248 €/MWh
Physical storage yes
 
 

 

Documents

 
Contract Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual Hub Icon - Ansehen und Download des Dokuments

 

easystore configuration per GWh Standard
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.80
  Injection duration Days 95
  Withdrawal duration Days 69
  Transfer duration Days 164
Capacity
WGV in GWh 500.00
IR in MWh/h 300.00
WR in MWh/h 400.00
Market area  Trading Hub Europe (THE)
Gas transfer point VHP THE
Service period 01/04/2024, 6 am - 01/04/2025, 6 am
Transport booking and nomination by VGS
Nomination until 04:30 pm for the following day
Lead time for renomination 2.25 h
Variable fee  1.248 €/MWh
Physical storage yes
 
 

 

Documents

 
Contract Icon - Ansehen und Download des Dokuments
Procedure description Icon - Ansehen und Download des Dokuments
GTC Icon - Ansehen und Download des Dokuments
Operating Manual Hub Icon - Ansehen und Download des Dokuments

 

easystore configuration per GWh Standard
  Injection rate MWh/h 0.60
  Withdrawal rate MWh/h 0.80
  Injection duration Days 95
  Withdrawal duration Days 69
  Transfer duration Days 164

Do you have other questions about VNG Gasspeicher GmbH's services?

Tender | Trading VSH 5Y

In this tender procedure, we offer storage capacities for the period from 01 April 2025 to 01 April 20301,000 GWh is available as a "Trading" product in the THE market area.

Configure this powerful storage product according to your needs or bid on our standard configuration with a turnaround time of 175 days. For optimal storage movement, we offer various add on products during the term, such as day-ahead capacities.

The bidding phase for this storage capacity will take place on 14 November 2023 from 1:00 pm to 1:30 pm CEST. You bid on a fixed price in €/MWh for the storage year 2025/2026 with max. 4 decimal places. The capacity fee is linked to the consumer price index and will be adjusted annually on 01 March of each year.


NOTE: For this tender procedure as well as for upcoming procedures following conditions of participation apply:

  • bidding is only possible in the logged-in area
  • for bidding the bidder needs an authorization for online booking
  • VGS performs a credit check; if necessary documents are not yet available, we will ask you for them
  • If the credit check is negative or no credit check is possible due to missing documents, a security deposit must be made for capacity surcharge.

You will find further information on this in the procedure description and in the registration and booking conditions.

Capacities WGV in GWh |  1,000.00
IR in MWh/h | 600.00
  WR in MWh/h | 820,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2025, 6:00 am - 01/04/2030, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

results according to the adjustment formula from Contract §5 Para. 3
Basis is the factor for storage year 2024/2025: 1.248 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments

 

Capacities WGV in GWh |  1,000.00
IR in MWh/h | 600.00
  WR in MWh/h | 820,00
Market area THE
Storage VGS Storage Hub
Service Period 01/04/2025, 6:00 am - 01/04/2030, 6:00 am
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Transfer point VGS Storage Hub
Variable fee

results according to the adjustment formula from Contract §5 Para. 3
Basis is the factor for storage year 2024/2025: 1.248 €/MWh

Interruptibility firm
Physical storage yes
 
easystore configuration per GWh Minimum Standard Maximum
  Working Gas Volume GWh 1.00 1.00 1.00
  Injection rate MWh/h 0.35 0.60 1.20
  Withdrawal rate MWh/h 0.30 0.82 1.50
  Injection duration Days 174 102 51
  Withdrawal duration Days 178 73 45
  Turnover duration Days 352 175 96
 

 

Documents

 
Sample contract  Icon - Ansehen und Download des Dokuments
Procedure discription  Icon - Ansehen und Download des Dokuments
GT&C Icon - Ansehen und Download des Dokuments
Comparison Version GT&C Icon - Ansehen und Download des Dokuments
Operating Manual Icon - Ansehen und Download des Dokuments