Scroll

Small but Clever: Micro.

Micro is just as high performance as it is flexible. What makes it special is that you can inject and then withdraw your natural gas within just one week. Micro lets you make a Trading product even more flexible but these small yet powerful packages are also a quick and clever solution when booked individually. Micro can also be booked at the Etzel facility making it available for use with Net Connect Germany.

Market area Gaspool
NetConnect Germany
Storage VGS Storage Hub, Etzel
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Five (5) working days
Non binding booking request: Five (5) working days
Online booking: One (1) calendar day
Implementation period
(Single booking with already existing contract "Micro")
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: One (1) calendar day
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub GASPOOL ONTRAS Gastransport GmbH VGS Storage Hub
Etzel GASPOOL Open Grid Europe GmbH Etzel ESE GASPOOL
Gasunie Deutschland Transport Services GmbH UGS Etzel-ESE
NetConnect Germany Open Grid Germany GmbH Etzel (Speicher ESE), Bitzenlander Weg 3, Speicher
       
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer   A Micro can be transferred between the contracts of Micro, Trading, Trading Storage or Pure. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     no
         

Fees

   
Capacity fee   60.00 €/Micro/Week
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Micro Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   
Market area Gaspool
NetConnect Germany
Storage VGS Storage Hub, Etzel
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Five (5) working days
Non binding booking request: Five (5) working days
Online booking: One (1) calendar day
Implementation period
(Single booking with already existing contract "Micro")
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: One (1) calendar day
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub GASPOOL ONTRAS Gastransport GmbH VGS Storage Hub
Etzel GASPOOL Open Grid Europe GmbH Etzel ESE GASPOOL
Gasunie Deutschland Transport Services GmbH UGS Etzel-ESE
NetConnect Germany Open Grid Germany GmbH Etzel (Speicher ESE), Bitzenlander Weg 3, Speicher
       
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer   A Micro can be transferred between the contracts of Micro, Trading, Trading Storage or Pure. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     no
         

Fees

   
Capacity fee   60.00 €/Micro/Week
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Micro Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   

Do you have questions or
need help deciding?

Small, Clever & Bio: BioMicro.

BioMicro has all the advantages of Micro - but is designed for the storage of bio natural gas. We guarantee that the biogenic properties remain unchanged: We keep a separate account especially for you.

Market area Gaspool
Storage VGS Storage Hub
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h (Within-Day)
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Five (5) working days
Non binding booking request: Five (5) working days
Online booking: One (1) calendar day
Implementation period
(Single booking with already existing contract "BioMicro")
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: One (1) calendar day
Transfer of ownership no
Physical storage yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
       
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer   A BioMicro can be transferred between the contracts of BioMicro, Micro, Trading, Trading Storage or Pure. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     no
         

Fees

   
Capacity fee   60.00 €/Micro/Week
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract BioMicro Icon - View and download the document
GT&C  Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   
Market area Gaspool
Storage VGS Storage Hub
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h (Within-Day)
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Five (5) working days
Non binding booking request: Five (5) working days
Online booking: One (1) calendar day
Implementation period
(Single booking with already existing contract "BioMicro")
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: One (1) calendar day
Transfer of ownership no
Physical storage yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
       
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer   A BioMicro can be transferred between the contracts of BioMicro, Micro, Trading, Trading Storage or Pure. Possibly for contracts with old GT&C other requirements might be noticed (e. g. volumetric contracts). Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     no
         

Fees

   
Capacity fee   60.00 €/Micro/Week
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract BioMicro Icon - View and download the document
GT&C  Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   

Do you have questions or