Micro
Scroll

Small but Clever: Micro.

Micro is just as high performance as it is flexible. What makes it special is that you can inject and then withdraw your natural gas within just one week. Micro lets you make a Trading product even more flexible but these small yet powerful packages are also a quick and clever solution when booked individually. Micro can also be booked at the Etzel and Jemgum facility making it available for use with THE and TTF market areas.

Due to Beate-regulation, which came into force on 01/01/2016, VNG Gasspeicher GmbH offers an account model for their storage Etzel. This enables both the discounted storage access, while using only one market area, as well as the market area crossing, this however, eliminates the grant of the discount on the transportation fee. In addition, a transfer between accounts is possible, but this falls to a rebooking fee. Thus you can continue to respond flexibly to market conditions.

Market area THE | TTF
Storage VGS Storage Hub, Etzel, Jemgum
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period
 
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking:  Three (3) hours
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub THE ONTRAS Gastransport GmbH VGS Storage Hub
Etzel THE
 
Gasunie Deutschland Transport Services GmbH UGS Etzel-ESE
Open Grid Germany GmbH Etzel (Speicher ESE), Bitzenlander Weg 3, Speicher
Jemgum

THE

 

​TTF
 

Gascade Gastransport GmbH Jemgum I
Gasunie Transport Services B.V. Oude Statenzijl
(astora Jemgum)
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer  

On request (charges as per fee schedule; free of charge for connection contracts)

  (Partial) capacity transfer     no

Documents

 
Sample contract Micro Icon - View and download the document
GTC Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule  Icon - View and download the document
   
Market area THE | TTF
Storage VGS Storage Hub, Etzel, Jemgum
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period
 
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking:  Three (3) hours
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub THE ONTRAS Gastransport GmbH VGS Storage Hub
Etzel THE
 
Gasunie Deutschland Transport Services GmbH UGS Etzel-ESE
Open Grid Germany GmbH Etzel (Speicher ESE), Bitzenlander Weg 3, Speicher
Jemgum

THE

 

​TTF
 

Gascade Gastransport GmbH Jemgum I
Gasunie Transport Services B.V. Oude Statenzijl
(astora Jemgum)
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer  

On request (charges as per fee schedule; free of charge for connection contracts)

  (Partial) capacity transfer     no

Documents

 
Sample contract Micro Icon - View and download the document
GTC Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule  Icon - View and download the document
   

Do you have questions or
need help deciding?

Small, Clever & Bio: BioMicro.

BioMicro has all the advantages of Micro - but is designed for the storage of bio natural gas. We guarantee that the biogenic properties remain unchanged: We keep a separate account especially for you.

Market area THE
Storage VGS Storage Hub
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h (Within-Day)
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: Three (3) calendar day
Transfer of ownership no
Physical storage yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub THE ONTRAS Gastransport GmbH VGS Storage Hub
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer  

On request (charges as per fee schedule; free of charge for connection contracts)

  (Partial) capacity transfer     no

Documents

 
Sample contract BioMicro Icon - View and download the document
GTC  Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule  Icon - View and download the document
Market area THE
Storage VGS Storage Hub
Turnover duration 7 Days
Characteristic curve restriction no
Minimum level no
Interruptibility interruptible
Minimum booking amount no
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h (Within-Day)
Implementation period
(Single booking with contract conclusion at the same time)
Non binding formless request: Two (2) working days
Non binding booking request: Two (2) working days
Online booking: Three (3) calendar day
Transfer of ownership no
Physical storage yes
Transfer point      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub THE ONTRAS Gastransport GmbH VGS Storage Hub
  Working gas volume GWh   interruptible 0.50
  Injection rate MWh/h   interruptible 5.00
  Withdrawal rate MWh/h   interruptible 10.00
  Injection duration Days       4.17
  Withdrawal duration Days       2.08
  Turnover duration Days       6.25
Contract term          
  Start     Possible for each gas day
  Duration     7 consecutive gas days or a multiple of it
Additional services          
  Gas transfer  

On request (charges as per fee schedule; free of charge for connection contracts)

  (Partial) capacity transfer     no

Documents

 
Sample contract BioMicro Icon - View and download the document
GTC  Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule  Icon - View and download the document

Do you have questions or
need help deciding?