Scroll

 

Pay usage related: Pure

The special feature of our product Pure is the usage related fee. Merely for the provision of working gas volume you pay a fix capacity fee. The fee for injection and withdrawal results depending on the actual usage. With its high injection rate and withdrawal rate Pure is brilliantly suitable for peak load, short-term fulfilment of demand as well as a quantity buffer.

Due to Beate-regulation, which came into force on 01/01/2016, VNG Gasspeicher GmbH offers an account model for their storage Etzel. This enables both the discounted storage access, while using only one market area, as well as the market area crossing, this however, eliminates the grant of the discount on the transportation fee. In addition, a transfer between accounts is possible, but this falls to a rebooking fee. Thus you can continue to respond flexibly to market conditions.

Market area Gaspool
Storage VGS Storage Hub
Characteristic curve restriction no
Interruptibility interruptible
Minimum booking amount 1.00 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) woring days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
  Working gas volume GWh   interruptible 1.00
  Injection rate MWh/h   interruptible 35.00
  Withdrawal rate MWh/h   interruptible 50.00
  Injection duration Hours       28.60
  Withdrawal duration Hours       20.00
  Turnover duration Hours       48.60
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Gas transfer   A Pure can be transferred between the contracts of Pure, Micro, Trading and Trading Storage. Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
Capacity fee WGV   5.46 €/GWh/d
Capacity fee IR   0.50 €/MWh
Capacity fee WR   0.50 €/MWh
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Pure Icon - View and download the document
Supplementary agreement Pure VSH Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   
Market area Gaspool
Storage VGS Storage Hub
Characteristic curve restriction no
Interruptibility interruptible
Minimum booking amount 1.00 GWh
Transport Booking and nomination by storage customer
Lead time for renomination 2.0 h
Implementation period Non binding booking request: Ten (10) woring days
Online booking: Two (2) working days
Transfer of ownership no
Physical storage yes
Transfer points      
Storage Market area Adjacent network operator Gas transfer point
VGS Storage Hub Gaspool ONTRAS Gastransport GmbH VGS Storage Hub
  Working gas volume GWh   interruptible 1.00
  Injection rate MWh/h   interruptible 35.00
  Withdrawal rate MWh/h   interruptible 50.00
  Injection duration Hours       28.60
  Withdrawal duration Hours       20.00
  Turnover duration Hours       48.60
Contract term          
  Start     Possible for each gas day
  Duration     At least 1 gas day, maximum of 20 years
Additional services          
  Gas transfer   A Pure can be transferred between the contracts of Pure, Micro, Trading and Trading Storage. Is the other customer’s contract a "Trading Storage" contract the gas transfer also requires that the working gas account of the other customer’s contract shows a working gas account balance after the gas transfer that does not exceed 95 % of the totally contracted working gas volume.
  Capacity overrun     yes
  (Partial) capacity transfer     yes
         

Fees

   
Capacity fee WGV   5.46 €/GWh/d
Capacity fee IR   0.50 €/MWh
Capacity fee WR   0.50 €/MWh
    2018/2019
Factor "Variable fee"   0.457 €/MWh
     

 

Documents

 
Sample contract Pure Icon - View and download the document
Supplementary agreement Pure VSH Icon - View and download the document
GT&C Icon - View and download the document
Operating Manual (Flange) Icon - View and download the document
Fee schedule (Flange) Icon - View and download the document
   

Do you have questions or
need help deciding?